GDK – Power Plant Mellach

District heating for Graz

Commissioned by VERBUND – Austrian Thermal GmbH& Co KG, Siemens AG Austria planned and constructed an 800 MW combined gas and steam turbine power plant for the already existing power plant at Mellach/Werndorf close to Graz. The power plant was designed to generate electric power and district heating.

In summer 2009, the GDK Mellach consortium, made up of the companies Strabag AG and Porr GmbH, assigned the responsibilities for the static-constructive processing of the following crucial components to Thomas Lorenz ZT GmbH and BHM Ingenieure Engineering & Consulting GmbH: cooling water intake structure, high voltage switchgear, sub-substructure for both the Mur and Mühlbach bridges, natural gas reduction unit and solar panels.

Project Information:
0000 000 Fo 190916 Tragwerksplanung
field of activity

Static-constructive processing

PG Lorenz-BHM

Leistungszeitraum.png
Period

2009 - 2010

Auftraggeber.png
Client

Consortium GDK Mellach

CONTACT
US NOW

We answer your questions quickly and reliably.

Offices:

Graz, Wien

Contact:

Scroll to Top