Thomas Lorenz’s team electrified
The pioneering role is in Thomas Lorenz’s blood. The first electric car was purchased in 2016 and he has long been electric on short journeys already.
Thomas Lorenz’s team electrified Read More »
The pioneering role is in Thomas Lorenz’s blood. The first electric car was purchased in 2016 and he has long been electric on short journeys already.
Thomas Lorenz’s team electrified Read More »
As the largest inner-city construction project in Carinthia, currently the “MaxPalais” by Gerhard Mosser is in the media. According to his specifications, living in the future is to be created in Villach near the train station.
Largest Inner-City Construction Project in Carinthia Read More »
The area of the former Reininghaus brewery is currently being transformed into an attractive district with different uses. By 2025, residential and commercial areas, recreational areas, a school campus and much more will be built on 20 construction sites.
Q1 Green Tower grows roots Read More »
For some time now, every planning project at Thomas Lorenz has been modeled in 3D. All information is managed in a central Revit building model. Now the next step were taken to be able to experience what has been planned up close.
Thomas Lorenz goes VR Read More »
Thomas Lorenz ZT GmbH received another order for the construction management and ÖBA department. In the immediate vicinity of the Med Campus Graz, ZWT GmbH is building a new research and laboratory building for around € 12 million.
Another ÖBA Contract! Read More »
Another milestone has been achieved in Linz, the escape stairs of the teaching building have been installed.
The double-flighted staircase enables an escape from the two floors above the lecture hall in an emergency. After all, a height of around 14 meters is overcome and the span of the stairs is around 25 m.
Construction Site Med Campus Linz in final Phase Read More »
At the end of January, the Thomas Lorenz ZT GmbH received a special order: the local construction supervision for the extensive general renovation of the A9 in the Trieben area in Upper Styria.
Pilot Project General Renovation A9 Read More »
Here is Far-sightedness is not a question about attitude, but a reality to be enjoyed every day: The “AUSTRO TOWER” with a total height of 135 meters is being built in the 3rd district of Vienna (Landstrasse).
Once around the AUSTRO TOWER Read More »
The ConDim concrete design program developed and sold by us is now connected to the powerful SOFiSTiK structural analysis program via an interface.
ConDim connected with SOFiSTiK Read More »
After the successful release of ConDim 8 in July 2020, we used the last few months to incorporate individual optimizations and improvements to make ConDim even more user-friendly. In addition, the following customer requests have already been implemented in ConDim 8.1:
ConDim – New Version 8.1 Read More »