Elevated motorway at Inzersdorf

At the start of 2015, the comprehensive renovation measures of the A23 South East corridor (Südosttangente) south of Vienna commenced. ASFINAG is investing approximately 290 Million Euro in four large construction sites - the Prater junction, the Inzersdorf junction, the elevated motorway at Inzersdorf, and the Prater Bridge.

All bridge structures of these construction sites will be completely removed and entirely replaced by 2018. And this, of course, while the flow of traffic is still maintained.

The construction for the 129 Million Euro project of the elevated motorway near Inzersdorf will be completed by the consortium ‘ARGE A23 HSI’, which consists of Strabag, Poor and Habau. The implementation planning for all eleven bridge structures as well as various associated objects along the 2 km long section will be undertaken by a consortium of Thomas Lorenz ZT GmbH and IBBS ZT GmbH.

Infobox
Services
SE
Structural Engineering
Period 2015 - 2018
Client ARGE A23 HSI
Building Costs € 129 Mio.