Erste Campus

On the site of the former Wiener Südbahnhof (Vienna Train Station – South), the headquarters of the Erste Group will be located. Around 26,000 m² will be used to provide office space for 4,500 employees.

The Erste Campus will be built up of three below-ground floors, a ‘base‘ area consisting of the ground and first floor, and the rising office towers (building areas A,B,C and D). The building will be enwrapped by glass façade. Thomas Lorenz ZT GmbH is responsible for the façade and the static calculations for the steel construction. Approximately 3,500 t of steel will be used in the form of supporting structures for the underground levels, as supporting structure for the buildings extended elements and spanned coverings.

The general contracting services for the basic structure and façade was performed by the consortium of SFL technologies GmbH and Granit GmbH.

Infobox
Services
SE
Structural Engineering
[steel construction & façade]
Period 2012 - 2013
Client SFL technologies GmbH
Scope 3,500 t of steel; 43,000 m² façade